Usha Group has set up three modules of 100000 TPY Coal based DRI Plant for captive use at its Gamharia site. OSIL Process has been adopted for the proposed plants after it was approved by their financial institution, IFC, Washington & DEG of Germany.

The first plant has been commissioned in August, 2004 while the successive plants have been commissioned in April 2009 and October 2009.

OSIL provided the following services: -

- Basic engineering, know-how and training
- Design & engineering of core plant
- Design, engineering & supply of proprietary equipment
- Supervision of erection, testing & commissioning and post commissioning services
- Inspection during manufacturing of core equipment

 

Usha Martin have successfully achieved 98% capacity utilization in kiln 1 along with a campaign life of 365 days in 2011 in kiln no3.